Saldanha Bay LPG Import Terminal
Client
Sunrise Energy
Location
Saldanha Bay, South Africa
Region/Country
APAC
Start date
Jan. 01, 2016
Scope of work

Clough subsidiary, CMR Marine, completed the construction contract for Sunrise Energy's Saldanha Bay Liquid Petroleum Gas (LPG) Import Terminal.

The project involved the fabrication, installation, and commissioning of a five-kilometre-long LPG pipeline.

The project enabled vessels to offload LPG to an onshore facility, via a three-kilometre subsea pipeline. The overland pipeline includes a shore crossing and a two-kilometre pipeline to connect with the Sunrise plant infrastructure, and the Terminal project will import and store LNG and distribute the product throughout Africa.

Project in numbers