Latest news
Clough subsidiary, CMR Marine, completed the construction contract for Sunrise Energy's Saldanha Bay Liquid Petroleum Gas (LPG) Import Terminal.
The project involved the fabrication, installation, and commissioning of a five-kilometre-long LPG pipeline.
The project enabled vessels to offload LPG to an onshore facility, via a three-kilometre subsea pipeline. The overland pipeline includes a shore crossing and a two-kilometre pipeline to connect with the Sunrise plant infrastructure, and the Terminal project will import and store LNG and distribute the product throughout Africa.