Latest news
Clough, in a joint venture with BAM, completed the contract to design and construct the Ichthys LNG Project Product Loading Jetty located at Blaydin Point, Darwin, Northern Territory.
The project involved the design and construction of a loading jetty, which included a typical piled with crossheads trestle with concrete superstructure, a loading platform for LNG and LPG / condensate, the provision of seawater intake including pump casing and slope protection, waste water outfall structures, navigation aids, marine operations, corrosion and cathodic protection systems.
The project allowed for gas to be transported from offshore.