Latest news
Webuild, as the lead in Terra Verde Joint Venture, is delivering the design and construction contract for Suburban Rail Loop East - Tunnels North.
The contract includes the excavation of two parallel tunnels for nearly 10 kilometres each, between the future stations of Box Hill and Glen Waverley, the creation of 39 cross passages between them, two station boxes, two tunnel access shafts, and one intervention and ventilation shaft. The tunnels will be excavated using tunnel-boring machines (TBMs).
The Suburban Rail Loop Project, of which the East section is a part, will transform public transport and will improve travel efficiency for more than 80% of Melbournians and take more than 600,000 cars off the roads every day.
Learn more about the project here.