Latest news
Clough, in a joint venture with BAM, completed the contract by Bechtel, to design and construct the Product Loading Facility (PLF) and Tug Berths associated with the Wheatstone Project LNG Plant near Onslow in Western Australia.
The project involved the construction of a 1.2-kilometre jetty with Marine Operations Platform, product loading platform incorporating a single LNG and Condensate load-out berth with associated breasting and mooring dolphin structures.
The project also involved the design, fabrication of topside Piperack modules and platform modules with piping installation, insulation, module testing and ultimate completed piping modules installation and hook-up with final testing also forms part of the scope.
The project contributed to the infrastructure of the Wheatstone Project, one of the largest offshore facilities in Australia, with a topsides weight of about 37,000 tonnes.