Clough, in joint venture with SUEZ, completed the Stage 2 expansion at the Beenyup Advanced Water Recycling Plant in Craigie.
The project involved the design, procurement, construction and commissioning of the main Ultra Filtration/Reverse Osmosis (UF/RO) process building, UV pump room, HV switch room and construction of two post tensioned concrete balancing storage tanks, as well as the supply, fabrication and installation of all the UF and RO process modules.
The expansion project doubled the plant’s capacity to recharge up to 28 billion litres of recycled water each year, providing additonal water security to the residents of Perth.